Special Projects

Port Of Liverpool

Upgrading current infastructure in the port of liverpool dock side.

Liverpool Industrial 2024
Port Of Liverpool
Project overview

The challenge

The seafront environment and high volume of heavy plant and vehicle movements made equipment selection a key consideration during the early design stages. Materials and equipment were specified to withstand the harsh coastal conditions while ensuring long-term reliability and durability.

The HDS solution

Heavy-duty materials, increased column set-backs, and wind loading assessments were incorporated to deliver a lighting solution that is not only efficient but also robust and durable for the demanding dockside environment.

The outcome

A robust lighting installation was delivered to support increased port movements and heavy traffic while maintaining the high level of energy efficiency required by the Port Authority.

set back lighting unitsTo support movements of heavy plant and cargo
Increase light uniformityProviding a safer work enivroment for port workers

Project images

Additional project drawings, site photographs and completed works.

Planning a similar lighting project?

Send HDS Lighting your drawings or project information for an initial review by one of our lighting engineers.