The challenge
The seafront environment and high volume of heavy plant and vehicle movements made equipment selection a key consideration during the early design stages. Materials and equipment were specified to withstand the harsh coastal conditions while ensuring long-term reliability and durability.
The HDS solution
Heavy-duty materials, increased column set-backs, and wind loading assessments were incorporated to deliver a lighting solution that is not only efficient but also robust and durable for the demanding dockside environment.
The outcome
A robust lighting installation was delivered to support increased port movements and heavy traffic while maintaining the high level of energy efficiency required by the Port Authority.


