Section 38 Lighting Design

The Airfields Deeside

To provide a Section 38 lighting design, ducting system and electrical schematics and cable layout.

Flintshire Highways 2025
The Airfields Deeside
Project overview

The challenge

The primary challenge was to design a lighting network that aligned with the site's ducting infrastructure, minimising road crossings and reducing future disruption to residents. A secondary challenge was to ensure the electrical system could support cable runs of up to 1 km while maintaining safety, voltage performance, and sufficient capacity for future network expansion.

The HDS solution

Low-energy lanterns were selected to maximise energy efficiency while maintaining compliance with the required lighting standards. To meet the council's requirement for a private cable network, slave feeder pillars were incorporated to maintain permissible voltage drop limits while providing flexibility for future network expansion.

The outcome

The design was successfully delivered and approved by the adopting authority. HDS continues to maintain close communication with both the client and the adopting authority, providing ongoing support to help ensure the successful delivery of the project.

100+ lighting unitsLarge Scale Energy Efficient Solution
11 feeder pillarsElectrically Safe and Flexible Design

Project images

Additional project drawings, site photographs and completed works.

Planning a similar lighting project?

Send HDS Lighting your drawings or project information for an initial review by one of our lighting engineers.